DPW Roadway Project Fog Seal Locations for 2026-06-25
The DPW Highway Division contractor, INDUS, will be conducting fog sealing operations on Upton and Rock Meadow Roads. The street... more ››
Drought Update 06/09/2026
Last week, Energy and Environmental Affairs (EEA) Secretary Rebecca Tepper declared a Level – 2 Significant Drought in the Southeast, Cape... more ››
Uxbridge DPW Recieves $210K Grant for Sidewalk Plow
Uxbridge DPW Recieves $210K Grant for Sidewalk Plow
Public Works Pavement Construction Update 5/29/26
Uxbridge DPW will be performing the following work:Hartford Ave East Paving will occur Thursday night June 4th. The... more ››
Public Works Pavement Construction Update 5/12/26
Uxbridge DPW will be performing the following work:Roadway milling and/or paving of the following streets:
FY2025 Annual Town Report
The FY2025 Annual Town Report is now available for viewing online... more ››
Healey-Driscoll Administration Announces $1.1 Million in Grants for Municipal Infrastructure Projects | Mass.gov
Drought Update 06/09/2026
Last week, Energy and Environmental Affairs (EEA) Secretary Rebecca Tepper declared a Level – 2 Significant Drought in the Southeast, Cape... more ››
PER- AND POLYFLUOROALKYL SUBSTANCES (PFAS) MAXIMUM CONTAMINANT LEVEL (MCL) NOTICE OF NONCOMPLIANCE (NON)
Our water system received notification of PFAS6 results showing that our system violated the 20 ng/L PFAS6 Maximum Contaminant Level (MCL)... more ››
Spotted lanternfly in Uxbridge!
The Mass. Dept. of Agricultural Resources (MDAR) recently confirmed an infestation of the invasive insect known as spotted lanternfly (... more ››









